日韩精品一区二区三区免费观看-第八色丰满正在无码-国产999久久久久一区二区-蜜芽精品国产区在线观看

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

延寿县| 吴堡县| 铜陵市| 全椒县| 阜新市| 于田县| 同江市| 永福县| 连江县| 邵武市| 上饶县| 玉溪市| 无锡市| 海晏县| 广元市| 双流县| 邛崃市| 清镇市| 康定县| 富川| 灵寿县| 高陵县| 邵阳县| 黔西县| 商城县| 涿州市| 扎兰屯市| 栾城县| 土默特右旗| 镇平县| 南城县| 蓬溪县| 伊川县| 商都县| 阿克陶县| 保德县| 萝北县| 漳州市| 精河县| 福海县| 文山县|