日韩精品一区二区三区免费观看-第八色丰满正在无码-国产999久久久久一区二区-蜜芽精品国产区在线观看

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

克什克腾旗| 建德市| 平原县| 稷山县| 磐石市| 太保市| 宁河县| 濉溪县| 高邑县| 贡觉县| 滦平县| 武乡县| 那曲县| 西藏| 威海市| 武川县| 阿合奇县| 漳浦县| 濮阳市| 渑池县| 泗洪县| 昭通市| 阆中市| 岳西县| 宜兴市| 阿鲁科尔沁旗| 通化市| 称多县| 呈贡县| 保德县| 镇平县| 五寨县| 松滋市| 伊金霍洛旗| 天台县| 策勒县| 长武县| 农安县| 育儿| 阿拉善右旗| 北安市|